Industry News

Weida main product booster cables , battery clip, tow rope,ratchet tie down.

« Good News Snapshots: integration into the community, close to the demand China's Eleventh Five-Year Review of Industrial Vehicles Industry Outlook second five »

Shanghai Rail Line 1 year to pay the fire alarm system update

    According to "the Oriental Morning Post" reported that the longest rail line to pay the 1st time 18 years old to use the fire alarm system, will be completed this year transformation.

    Recently, Shen Tong Group revealed that line 1 has been completed Xinzhuang, Outer Ring Road, Lianhua Road, Shanghai South Railway Station, Caobao the transformation of 11 work stations, the Shanghai Railway Station, People's Square, Huangpi, Shaanxi South Road, Jinjiang Park , Meilong parking lot six stations are transforming.

    Part of the city rail transit line construction earlier, in which Line 1 was opened to traffic since 1993, has been operating for 18 years, fire and electrical equipment line has entered the aging period, there is a fire hazard.

    Shanghai this year, ratchet tie dowm "two sessions", the city CPPCC members, the Municipal Public Security Bureau deputy director Wu Yanan to submit proposals, the proposed rail transit operating unit of electrical equipment and fire equipment to conduct a comprehensive investigation of aging in detail the operation of facilities and equipment to master the use of various types of meet or exceed the useful life of electrical equipment, fire fighting facilities and decoration materials, should be replaced, and effectively improve the station, car flame retardant grade, reduce security risks.

    Response in the proposal, Shentong Group, said rail transit line 1 has been in operation for 18 years, some of fire fighting equipment and facilities to the aging period, it has been since last year, Shen Tong Group has Line 1 Shanghai Railway Station to Xinzhuang station fire alarm system comprehensive reform, and has completed Xinzhuang, Outer Ring Road, Lianhua Road, 11 stations of the reform. Shanghai Railway Station, People's Square, Huangpi, Shaanxi South Road, Jinjiang Park, parking lot 6 Meilong are transforming the station plans to complete by the end of this year. Then, in addition to extension of the North in recent years and the new Shanghai South Railway Station, all stations of the old fire alarm system will be fully replaced.

    In addition, the Shanghai Railway Station to Xinzhuang station fire water system transformation has been completed. Shanghai Railway Station to Station 11 Cao Bao Road station smoke control system has to complete the transformation.

Post comment:

◎welcome to give out your point。

Calendar

Comments

Previous

iande Weida Electrical Appliance Tools Co.Ltd. professionally manufacture booster cables , battery clip, tow rope,ratchet tie down.